The project comprised of the demolition of three number existing industrial units to allow the construction of a new steel frame single storey storage and shop unit connected to the existing pottery building. This was carried out over two phases to allow part of the site to be handed back to the client for further works.

Phase 1 ran from June to August and Phase 2 ran from August to December.  As part of the work the ground level around the site was lowered to allow for a new car park to be installed by another contractor.