We created a link block and group study room, taking great care to ensure constructional sympathy with both adjacent buildings.  Using coursed natural stone the works were complete during the schools summer shut down period.  Aluminium doors were pre-ordered and fabricated due to the long lead in periods and the short construction window.  This converted a small area of playground into valuable useable space.